· Our company absorb the lateset technologies developed both home and aborad for large diameter HDPE pipe production line and buried FR-PP pipe production line to produce large diameter 200-2000 quality discharge pipe. The pipe is increasingly becoming a mainstream product for urban drainage pipes will gradually replace the steel pipes and cement pipes, and other plastic pipe.
· This production line adopts advanced PLC computer control, double stage pressure reduction screw and composite head die, of which includes pipe extruder, melt extruder, winding forming machine, cutting machine and relevant auxiliaries. This creep-resistance, convenitent connection and economic construction.
· This production line can make the following pieps: double wall corrugated wound pipe, double wall pipe wall winding pipe and triple winding pipe.
Main Technical Parameter:
| Specification (mm) | Extruder | Total Power Installed (kw)(Actual Consuption 50%) | Max. Output (kg/h) | Overall Dimensions (L×W×H) |
Model | L/D Ratio | Main Motor Power (kw) | Heating Power (kw) |
SKRG800 | 200-800 | SJ90 | 30/1 | 75 | 30 | 230 | 260 | 10×21.5×2.6 |
SJ65 | 30/1 | 45 | 18 |
SKRG1200 | 400-1200 | SJ90 | 34/1 | 110 | 30 | 300 | 500 | 10×23×2.7 |
SJ65 | 30/1 | 75 | 18 |
SKRG1500 | 900-1500 | SJ90×30 | 30/1 | 110 | 30 | 450 | 600 | 28×18×6 |
SJ90×34 | 34/1 | 110 | 36 |
SJ65×30 | 30/1 | 75 | 18 |
SKRG2200 | 1200-2200 | SJ120 | 30/1 | 185 | 60 | 500 | 700 | 30×20×7 |
SJ90 | 34/1 | 110 | 36 |
SJ65×30 | 30/1 | 75 | 18 |
SKRG3000 | 2200-3000 | SJ150 | 30/1 | 280 | 80 | 650 | 800 | 32×20×8 |
SJ120 | 30/1 | 185 | 60
|