Product Description
QJ-88G hot filling bottle blowing machine is the special machine for MAX 2L hot filling bottles with 700-800pcs/hr capacity.
And our company can offer the relevant mould for your every need. Our machine is small in size, low in energy consumption and high in productivity.
We will even send an engineer to your country to help set up the machine.
Machine Specifications :
Type | Item | Unit | Technology Data |
|
|
Main Machine | Volume of Product | L | 0.25-2.0 |
|
Theoretical Productive Capacity | pcs/hr | 700-800 |
|
Max. Diameter and Height | mm | 90*320 |
|
Max. Mould Plate Dimension(L*H) | mm | 350*450 |
|
Mould Thickness | mm | 120-280 |
|
Clamping Force | KN | 120 |
|
Mould Opening Stroke(Adjustable) | mm | 250 |
|
Working Pressure | mpa | ≤1.0 |
|
Blowing Pressure | mpa | ≤3.5 |
|
Weight of Main Machine | kg | 550 |
|
Dimension of Main machine | mm | 1520*580*1800 |
|
Infrared Heater | Weight of Infrared Heater | kg | 400 |
|
Dimension of Infrared Heater | mm | 1800*560*1310 |
|
Electricity | Voltage/Frequency | V/HZ | 220-380/50-60 |
|
Power | KW | 10 |
|
Note: Due to continual improvement, specifications are subject to change without notification. Please refer to the latest actual machine.
PS: Our company specializes in the manufacture of bottle blowing machinesplastic injection molding machinesPET preform and plastic products. Just tell me what plastic product you want to produce and I will help you choose the best model for your needs. We believe that our competitive priceshigh quality and excellent service will bring us both benefits. Choose us-choose the best!






1,Are you a factory ?
Yes, we are a factory,more then 20 years factory
2,Where are your factory ?
Address: Economic Development Zone of Zhuling, Huangyan,Taizhou city, Zhejiang province,You can by air to luqiao air port,then we will drive the car to pick you up!
3, What is your delivery time?
About 30 days
4, What's your payment ?
30% deposit against the contract by T/T should be paid before the order;
70% balance should be paid off by T/T after inspection before delivery;