1.Quote | According to sample, drawing and specific requirement. |
↓ |
2.Discussion | Mould material, cavity number, price, runner, payment, etc. |
↓ |
3.S/C Signature | Approval for all the items. |
↓ |
4. Advance | Pay 40% by T/T. |
↓ |
5.Product Design Checking | We check the product design. If some position is not perfect, or can not be done on the mould, we will send customer the report. |
↓ |
5.Mould Design | We make mould design on the basis of confirmed product design, and send to customer for confirmation. |
↓ |
6.Mould Tooling | We start to make mould after mould design confirmed. |
↓ |
7.Mould Processing | Send report to customer once each week. |
↓ |
8.Mould Testing | Send trial samples and try-out report to customer for confirmation. |
↓ |
9. Mould Modification | According to customer’s feedback. |
↓ |
|
10.Balance settlement | 60% by T/T after the customer approved the trial sample and mould quality. |
↓ |
|
11.Delivery | Delivery by sea. The forwarder can be designated by your side. |