Craft Procedure
A、 Dump PVC etc.Materials
PVC and other materials are manually poured into dump station and conveyed into 4 storehouses pneumatically.Workers will be alerted by the material meter signal to feed or stop.The store house is equipped with loosing material device
B、 Measurement and feeding of materials
Main material is fed into 3 electronic balance and then mixer by rotary valve below store house.
C、 Putting auxiliary materials
Auxiliary materials are fed by step in feeder after manual measuring.When mixer ask auxiliary materials,the pneumatic.board valve come to open,step in feeder starts,infrared ray test the material overpass ,step in feeder stops,time-lapse stop pneumatic board value.
D、 Heating minxing and cooling mixing
In heating mixing,at the same time water is drained by compulsion absorption device;when materials reach the setting temperature,discharging valve will open automatically and materials move into a storehouse of 1m³.
E、 Dust catch
PVC,dry materials and broken materials will be cleaned by an impulse dust catcher;this device can adjust pulse frequency and width.